The historic Hachez chocolate factory in the heart of Bremen is being transformed through a careful process of reuse, selective removal, and contemporary additions. Established in 1895, the factory grew over decades into a densely built, enclosed industrial ensemble.
Today, the transformation begins by rethinking this accumulated density. By removing obsolete structures and later additions, the historic fabric is selectively revealed, creating space for new uses, courtyards, and generous open spaces. This process of addition and subtraction opens up the former factory, retaining its heritage-protected character while establishing a permeable and inviting urban quarter. Historic facades will be carefully restored and adapted to meet contemporary energy standards, integrating the existing structures as an active part of the future site.
The preserved buildings and an innovative energy concept form the identity of the new Hachez Quartier. A shared infrastructure provides a forward-looking framework, centered around a modern district heating and cooling network powered by a central Klimaturm (Climate Tower). Conceived as a one-megawatt energy hub combining air-source heat pumps and power-to-heat modules, the Klimaturm transcends mere technical infrastructure. It becomes a highly visible landmark, expressing the transition from industrial production to an energy-conscious urban environment.
The architectural design seamlessly weaves together student housing, music rehearsal spaces, contemporary residential units, offices, gastronomy, and cultural venues into an integrated mixed-use fabric. This programmatic diversity is supported by a mobility concept that moves vehicle infrastructure into an underground garage, freeing the surface from traffic and creating highly walkable public spaces.
Ultimately, the Hachez Quartier is a model for how industrial heritage can be carefully transformed. By bringing together existing architecture, new uses, public space, and sustainable infrastructure, the project connects the site’s industrial past with a resilient, forward-looking urban future.
Study
01/2025
Start of planning
03/2025
Completion
2030
Gross floor area
approx. 30,000 m²
Site area
9,620 m²
Built area
5,800 m
Height
25 m
Number of levels
6
Project managers
Eva Schrade
Daniela Hensler
Project team
Roland Lipusz
Petr Malasek
Lorenzo Menato
Client
denkmalstadt GmbH,
Bremen
In coorperation with
GME Architekten,
Bremen and KUKUK
Architekten, Bremen
CONSULTANTS
Structural engeneering
Wittler Ingenieure
GmbH, Bremen
Building services/
Material-handling
Hasa-planning
Ingenieurbüro für
Gebäudetechnik GmbH,
Bremen
Building physics
G4W GmbH, Hamburg
Fire protection/
Detailed design
hhpberlin Fire Protection
Engineers GmbH, Hamburg
Open space
Agende Ter.de GmbH,
Karlsruhe
An Energy-Driven Transformation of Bremen’s Industrial Heritage
Building Site
Living and working in the chocolate factory.
Elevation Westerstrasse
Elevation Suderstrasse
Elevation Annenstrasse